We operate across four core areas: deposit return systems, recycling facilities, smart waste collection and turnkey infrastructure. The common denominator in all: measurable ROI and OPEX optimisation.
DRS system architecture, reverse vending machine (RVM) portfolio, counting centre design, operator management, software infrastructure, EU DRS compliance models and ROI projections.
In Türkiye, packaging waste return rates remain below 30%. Inadequate DRS infrastructure, regulatory uncertainty and operator inexperience are major barriers facing the industry.
We offer reverse vending machine (RVM) selection compatible with mandatory deposit schemes and the national DSYS integration period (UES), counting centre (SDM) design, software platform integration and operator training under one roof.
With our DRS solutions benchmarked against EU reference models, we deliver 85%+ return rates, an average payback period of 22 months and positive cash flow.
| Metric | Current System | BLN DRS Solution | Financial Impact |
|---|---|---|---|
| Return Rate | 25–30% | 80–90% | 3x Increase |
| CAPEX Payback | Uncertain | 18–24 Months | Predictable ROI |
| Annual Net Savings | — | Deposit income + raw material sales | Positive Cash Flow |
| Operator Efficiency | Manual counting | Automated counting and verification | 60% Labour Savings |
Reverse vending machine selection, configuration and standby mode energy optimisation.
Central verification facility design, optical recognition and count accuracy infrastructure.
Operator management, deposit flow monitoring and EU DRS compliance model integration.
Feasibility study and compliance analysis for mandatory DRS and national DSYS integration period (UES)
RVM selection, counting centre design and software configuration
On-site installation, supply chain setup and operator training
KPI tracking, performance reporting and continuous optimisation
Request a free feasibility study for your DRS investment. Learn more about our guaranteed 22-month payback period model.
Request Feasibility Study →
Turnkey facility installation, capacity planning, equipment selection, plant automation, licensing and permitting support, CAPEX/OPEX modeling.
Most existing facilities fail to achieve target purity rates due to low automation, incorrect equipment selection and capacity mismatches.
Capacity planning based on waste stream analysis, precise equipment matching and SCADA/PLC-based automation architecture.
Optical sorter integration achieving 98.5% purity, a 32% OPEX reduction and continuous improvement infrastructure.
| Metric | Current System | BLN Plant Solution | Financial Impact |
|---|---|---|---|
| Sorting Purity | 85–90% | 97–99% | Increased Raw Material Value |
| OPEX Reduction | High energy + labour | Automated flow management | 32% Reduction |
| CAPEX Payback | 48+ Months | 24–36 Months | 40% Faster Amortisation |
| Plant Capacity | Fixed-line design | Suitable for modular expansion | Scalable Investment |
NIR-based polymer recognition, colour sorting and cross-contamination prevention.
Capacity-based press selection, baling automation and logistics preparation integration.
SCADA integration, flow tracking, production reporting and quality control dashboard.
Existing waste composition, volume analysis and capacity requirements assessment
Equipment selection, facility layout planning and automation architecture
Turnkey assembly, environmental permitting and licensing management
Commissioning tests, KPI monitoring and continuous optimisation
Let us build a CAPEX/OPEX model for your plant investment. Free preliminary feasibility report.
Request CAPEX Model →
Sensor-equipped containers, fill-level monitoring, route optimisation, municipal integration, analytics dashboard and OPEX reduction model.
Operating with fixed routes leads to empty container visits, wasted fuel and overflowing bins—causing major operational and environmental issues.
Ultrasonic fill-level sensors, machine learning-based routing algorithms and a real-time field monitoring platform.
Dynamic route optimisation delivering 30% fuel savings, a 2.4x increase in field efficiency and reduced carbon emissions.
| Metric | Current System | BLN Smart Waste Solution | Financial Impact |
|---|---|---|---|
| Fuel Costs | Fixed route schedule | Fill-level dynamic routing | 40% Savings |
| Collection Efficiency | 1x (fixed frequency) | On-demand collection | 2.4x Increase |
| OPEX Reduction | High vehicle + headcount costs | Optimised fleet management | 35% Reduction |
| Carbon Emissions | Not tracked | Automated tracking and reporting | 30% Reduction |
IP67 rating, -40/+85°C operating range, 10-year battery life, LoRaWAN/NB-IoT connectivity.
ML-based fill prediction, vehicle capacity matching and real-time route updates.
Municipal/facility integration, KPI tracking, collection performance and environmental impact reporting.
Container inventory, geographic analysis and fill profiling
Device mounting, network configuration and platform integration
30-day data collection, model calibration and route optimisation
Staff training, KPI monitoring and continuous improvement loop
Launch a pilot project for smart waste collection. Benefit from our free 30-day Proof of Concept (PoC) programme.
Apply for Pilot Project →
Collection-sorting-recovery supply chain design, fleet management, transfer station planning and logistics efficiency projections.
Managing collection, sorting and recovery independently causes severe cost overruns and efficiency losses.
Single-platform management from collection point to recovery facility, fleet optimisation and transfer station planning.
Integrated supply chain management yielding a 28% cost reduction, 45% increase in vehicle utilisation and significant carbon savings.
| Metric | Current System | BLN Logistics Solution | Financial Impact |
|---|---|---|---|
| Logistics Cost | Disconnected operators | Integrated supply chain management | 28% Reduction |
| Vehicle Utilisation Rate | 55–60% | 85–90% | 45% Increase |
| Transfer Efficiency | Manual planning | Algorithmic station management | 2x Volume Improvement |
| Risk Mitigation | Regulatory compliance uncertainty | Automated regulatory tracking | Zero Penalty Risk |
Collection-sorting-recovery flow modeling and bottleneck analysis.
Location optimisation, capacity sizing and traffic simulation.
GPS tracking, capacity matching, fuel optimisation and maintenance scheduling.
Analysis of current logistics flows and bottlenecks
Fleet, route and transfer station layout optimisation
Platform deployment, vehicle hardware and operator training
KPI tracking, cost monitoring and monthly optimisation cycles
Let us optimise your waste logistics chain. Request a free efficiency analysis of your existing system.
Request Efficiency Analysis →
End-to-end infrastructure projects for municipalities and private industry—feasibility, design, build, operation and warranty models.
Municipalities and private enterprises often deal with multiple suppliers for environmental infrastructure. This leads to a lack of coordination, budget overruns and delays.
End-to-end single-point accountability from feasibility and commissioning to permitting and operational support.
Under our turnkey model, we handle design, installation and operations seamlessly. Responsibility is unified; we absorb the risks of delays and cost overruns.
| Metric | Fragmented Model | BLN Turnkey | Financial Impact |
|---|---|---|---|
| Project Budget | Coordination overheads | Single point of accountability | 15% Savings |
| Delivery Schedule | Subject to supplier delays | Guaranteed delivery schedule | Zero Delays |
| Operational Performance | Vague warranty coverage | KPI-backed performance guarantee | SLA-tied performance |
| Regulatory Compliance | Separate consultancy cost | In-house permitting and licensing management | Integrated Compliance |
Feasibility report, 3D plant design and detailed engineering documentation.
EIA reports, environmental permits, operating licences and municipal liaison.
SLA-based operational support and scheduled maintenance with clearly defined commissioning criteria.
Project scope, budget framework and regulatory requirements
Plant design, equipment procurement and permitting procedures
Construction, installation, testing and commissioning
Performance testing, warranty coverage and long-term operational support
Get a turnkey proposal for your project. Single-source accountability from feasibility study to operation.
Request Project Proposal →Build Your ROI Model — Get a free preliminary feasibility assessment from our experts.
Get Feasibility Assessment →